ASSEMBLY:
All Silos are delivered clean and in working order. Please Follow
the steps below to make efficient and safe use of the silo on your
jobsite.
STEP 1:
Select
an area on the jobsite where the ground is firm level and stable,
(Place silo in a downwind position where product dust will not
disperse into operator)
- Insert Forks Completely into fork tubes to move the silo (Standard
Forklift Required - 26 Ft 4500 lb capacity)
- Secure third contact point with a chain or strap (5000 Pound
Working Load) This Prevents the Silo from Sliding off the Fork
Tubes during transport.
- Place Silo on the Approved Location
- Lower Ladder (Allowing Access to the Safety Railed Platform)
- Attach Safety Ring and dust curtain on the top of the silo
(Only do this when silo is not in raised position (Follow all
OSHA jobsite regulations)
STEP 2:
Raise
tower to the desired height until the holes in the silo leg match
the holes in the receiver tube assembly.
- Using the double leg pins attached to the frame, secure the
upper silo assembly by sliding the leg pins into position (Stand
outside of the perimeter of the silo)
- Secure the pins with the safety hitch pins.
- Repeat Process for all four sides.
- Attach the Slide Gate handle in its place, matching the short
handle to the gate door and the long handle to the pivot point
located on the cross brace.
STEP 3:
Attach
all warning signs and secure the silo at the jobsite, make sure
silo is ready to load.
- Prepare to Load Bulk bags into the silo (Visually inspect the
bulk bag, check for fraying on loops and bag - If conditions exist
DO NOT ATTEMPT TO LOAD BAG - Call Us at (800) 724-8193
- Bulk Bags are easily picked up by sliding forks through the
bags reinforced loops. Once the bag is above the silo and in position,
2-3 inches above the safety ring the laborer on the safety platform
can release the bags contents by pulling on the bags closure pin
on the bottom of the bag. (Use the supplied SPEC MIX Safety hook)
- Make sure the bag does not touch the safety ring and always
wear protective gear including dust mask, safety goggles, and
gloves.
STEP 4:
After
the silo is loaded with product, place the batch mixer beneath
the cone under the silo's boot.
- If desired trim the boot so the product goes directly into the
mixer.
- To make product add the desired amount of water to the mixer
and pull back on the silo handle to dispense the amount of material
needed to achieve the desired consistency.
- Let the product mix four to five minutes to ensure complete
hydration of all materials for optimal workability and board life.
STEP 5:
The
SPEC MIX® silo system can easily be transported to multiple
locations on your jobsite, ensuring that you have the material
where you need it, when you need it
- Lift up the silo and pin the legs in the upright position, transport
to the new location, (Dry, Level and Stable Ground)
- Place the silo and re-secure all leg pins and safety guards.
- Remember to follow all OSHA Jobsite regulations when working
on the jobsite.
- Call Package Pavement today, to learn more about the industry
standard for mortar, grout, and stucco delivery on jobsites across
America. (800) 724-8193
STEP 6:
- After Job is complete, please make sure the silo is clean and
there is no product remaining inside of it. Thank You for choosing
SPEC MIX®
Check out our full Spec
Mix Product Line...(Click Here)
Visit www.specmix.com
for more details...
|
As licensed QUIKRETE® and SPEC MIX® manufacturers, PACKAGE PAVEMENT™,
offers customers in the Tri-State area including Metro New York, Central
New York, Western Connecticut, Berkshire County in Massachusetts and
Western Vermont, the opportunity to receive premium quality products
for pickup, or, with delivery options among the most timely and professional
in the industry. WEBSITE DISCLAIMER INFO. |
|
|